Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Application for Review of Minor Land Development

Steps

  1. 1. Step One
  2. 2. Application Requirements
  • Step One

    1. This application shall apply to the following: 1. The improvement of 1 lot of less than 20,00 square feet in area for 1 multifamily residential building or a group of 2 or more residential or non-residential buildings.
      2. The improvement of 1 lot of less than 10,00 square feet for 1 non-residential building, regardless of the number of tenants.
      3. Any change of use, addition to or structural enlargement of a non-residential structure which results in either:

      a. An increase in the gross floor area of the principal building of more than 1,500 square feet;
      b. An increase in the paved area of the lot of more than 325 square feet but less than 1,500 square feet; or
      c. An increase in the gross floor area of the principal building and the paved area of the lot which, in combination, is more than 325 square feet, but less than 1,500 square feet; or

      4. The division or allocation of land or space among 2 or more occupants by leasehold or condominium.

    2. Proposed Use

    3. Note: Developed area includes all areas utilized for building, parking, loading, recreation and all areas graded, improved or otherwise disturbed in connection with the development of the site.

    4. Is rezoning required to permit proposed land use?

    5. If yes, has an application for rezoning been filed?

    6. Does the proposed development require the issuance of any zoning variances?

    7. If yes, has an application for a variance been filed?

    8. Does the proposed development require the issuance of waivers or modifications?

    9. Note: A written request for modification must accompany the application.

    10. The proposed streets will be:

    11. Has a Highway Occupancy Permit from the proper authority been applied for or issued?

    12. Will any existing roads need additional right-of-way?

    13. Is public water available to the site?

    14. Has a letter of intent for service been supplied with this application?

    15. Is public sewage available?

    16. Has a sewage facilities planning module been submitted?

    17. Has the public sewage facilities owner approved the design plans?

    18. Has a stormwater management plan with supporting documentation been submitted?

    19. Is the site within the 100 year flood boundary?

    20. If yes, have plans been prepared in accordance with the Township Floodplain Ordinance?

    21. Has an on-site sub-surface soils investigation been conducted?

    22. Has a copy been submitted with the application?

    23. Has there been a determination regarding the likelihood of landslides or landslide prone areas or soils on the site?

    24. Has the site been deep mined?

    25. Has a traffic impact analysis been performed?

    26. Will the proposed development include the relocation, alteration or enclosure of any watercourse or wetland?

    27. If so, have necessary permits been applied for and/or submitted?

    28. The applicant hereby acknowledges that the he/she has familiarized himself/herself with the requirements of the township’s governing ordinances and hereby agrees to abide by all rules, regulations, ordinances and resolutions of the township of collier. The applicant further understands that he/she is responsible for all engineering and legal review fees associated with this application.

    29. Applications without the owners signature will not be accepted.